Waste water treatment plant, sewerage and water supply in Sázava

Project specification:

NázevWaste water treatment plant, sewerage and water supply in Sázava
RegionVysočina
LocationSázava
Project studioEKOEKO s.r.o
InvestorMěsto Sázava
Start datenovember 1998
Finish datedecember 2001
ValueCZK 20 - 100 million
Type of contractstate orde
Type of projectEnvironmental and engineering structures
Type of buildingwaste water treatment plant

Description:

The waste water treatment plant comprises a single-storey building with a saddle truss roof. The waste water treatment plant was designed as a typical mechanical and biological treatment plant with low stress activation, divided into three biological lines. The proposed treatment plant’s capacity is 5,050 equivalent inhabitants. In the underground section of the plant, the denitrification and activation tanks are located along the settling and sedimentation tanks and the air blower system. In the above ground part of the building we can find the operational room, mechanical pre-cleaning sludge press with accessories and the chemical dosing device for removing phosphorus, and other parts of the machina and technology equipment. The entire waste water treatment plant works in automatic mode due to the measuring system and the regulation and management of sewage treatment processes, while all important data is transferred for dispatch by GDF radio transfer. In the scope of the project, a 14,200 m long sewage system and a 7,390 m long water supply system were built.